Wednesday, November 21, 2007

Phew! Finally Done

I'm so happy to be done with this sweater! I put off the finishing and blocking for a week after the knitting was complete, but finally took care of those last few details. Full notes on modifications etc are on my blog - www.knitography.com - but I will say that I am very happy with how it turned out. I wore it to work yesterday and already got a compliment on it, which feels good after all that work!

Tuesday, November 13, 2007

Mine is done too!

Here it is, my Tangled Fields of Gold.


I am just so happy and satisfied! The full details and more pictures are on my blog:
http://knittingobssessions.blogspot.com/

This was a great way to mark my first year as a knitter. I've noticed there are quite a few of us Freshmen on this knit-a-long, so rock on my compatriots! This sweater is totally doable!

Wednesday, November 7, 2007

She's nearly there

I'm really excited about finishing the knitting on this project. It was a great knit and I'm almost sad it's over. Almost.

I still have the finishing details to worry with, weaving in the ends, sewing on buttons, and the like. And I'm hoping the tangled bits don't look quite as puckered after I block it. But all in all I can't wait to wear it.


img hosted at flikr


img hosted at flikr

Tuesday, October 30, 2007

One Long Row at a Time

I finally made it to the cabled yoke, after what felt like miles of stockinette. I'm about halfway through the cable chart, although I would be a few rows further along if I didn't have to rip out and re-do every other cable row due to my own stupidity when it comes to reading the chart. I don't usually have trouble reading charts, but these rows are really long and perhaps I don't check the chart as often as I should to see what happens next. Regardless, I really enjoy watching the cable grow as I make my way through row after row. Here's how it looks so far (although the colour isn't very accurate):



I'm starting to get excited about getting this finished and wearing it, so after a brief loss of momentum this project is zooming along again. Given the change in the weather, I can't get it done soon enough!

Monday, October 29, 2007

Finished!


I'm very happy with it. Yarn was Mr. Joe Blanket from Elann.com and was less than $30.

Saturday, October 27, 2007

Sleeve Ribbing?




I was wondering if anyone had experimented with the length of the ribbing on the sleeve. I was using the magic loop method that was outlined so well on this KAL for the sleeves and have been happy so far but I was looking at the pictures of the sweater in the mag and I was considering modifying the amount of inches of ribbing on the sleeves to be a few inches less so it was around 5 inches like the body is. Has anyone already done this so that they have pictures or does anyone have any advice?

Tuesday, October 23, 2007

sleeve ho



Wow - this is a fast knit! I have reached the underarms. So the next step is to cast on a sleeve. I agree that a 9.5" cuff is too baggy for a 6" wrist. So I will be casting on with 3.25mm dpns which should give me a 7.5-8" cuff. Part way up the garter ribbing, I'll switch to 3.5mm needles.