Wednesday, November 21, 2007
Phew! Finally Done
I'm so happy to be done with this sweater! I put off the finishing and blocking for a week after the knitting was complete, but finally took care of those last few details. Full notes on modifications etc are on my blog - www.knitography.com - but I will say that I am very happy with how it turned out. I wore it to work yesterday and already got a compliment on it, which feels good after all that work!
Tuesday, November 13, 2007
Mine is done too!
Here it is, my Tangled Fields of Gold.

I am just so happy and satisfied! The full details and more pictures are on my blog:
http://knittingobssessions.blogspot.com/
This was a great way to mark my first year as a knitter. I've noticed there are quite a few of us Freshmen on this knit-a-long, so rock on my compatriots! This sweater is totally doable!
http://knittingobssessions.blogspot.com/
This was a great way to mark my first year as a knitter. I've noticed there are quite a few of us Freshmen on this knit-a-long, so rock on my compatriots! This sweater is totally doable!
Wednesday, November 7, 2007
She's nearly there
I'm really excited about finishing the knitting on this project. It was a great knit and I'm almost sad it's over. Almost.
I still have the finishing details to worry with, weaving in the ends, sewing on buttons, and the like. And I'm hoping the tangled bits don't look quite as puckered after I block it. But all in all I can't wait to wear it.
I still have the finishing details to worry with, weaving in the ends, sewing on buttons, and the like. And I'm hoping the tangled bits don't look quite as puckered after I block it. But all in all I can't wait to wear it.
img hosted at flikr
img hosted at flikr
Tuesday, October 30, 2007
One Long Row at a Time
I finally made it to the cabled yoke, after what felt like miles of stockinette. I'm about halfway through the cable chart, although I would be a few rows further along if I didn't have to rip out and re-do every other cable row due to my own stupidity when it comes to reading the chart. I don't usually have trouble reading charts, but these rows are really long and perhaps I don't check the chart as often as I should to see what happens next. Regardless, I really enjoy watching the cable grow as I make my way through row after row. Here's how it looks so far (although the colour isn't very accurate):

I'm starting to get excited about getting this finished and wearing it, so after a brief loss of momentum this project is zooming along again. Given the change in the weather, I can't get it done soon enough!
I'm starting to get excited about getting this finished and wearing it, so after a brief loss of momentum this project is zooming along again. Given the change in the weather, I can't get it done soon enough!
Monday, October 29, 2007
Saturday, October 27, 2007
Sleeve Ribbing?


I was wondering if anyone had experimented with the length of the ribbing on the sleeve. I was using the magic loop method that was outlined so well on this KAL for the sleeves and have been happy so far but I was looking at the pictures of the sweater in the mag and I was considering modifying the amount of inches of ribbing on the sleeves to be a few inches less so it was around 5 inches like the body is. Has anyone already done this so that they have pictures or does anyone have any advice?
Tuesday, October 23, 2007
sleeve ho
Subscribe to:
Posts (Atom)

